Real estate & home

30 Instagram Post Ideas for Home Builders

Buyers weighing a new build against an older house, and buyers under contract watching a lot go up and wondering what is happening this week.

First-slide hooks writtenSlide-by-slide outlinesCaption starters

Why most home builders struggle on Instagram

Most builder accounts post the same three things: a model home living room, a drone shot of a muddy field, and a lot release graphic. All of it is aimed at people who have already decided. Nobody is talking to the buyer still arguing with their partner about whether new construction is worth it.

That argument has specific parts to it. Thin walls. Small yards. Cracks in the first year. Whether you can change anything. What the finishes really cost. Every one of those is a carousel, and every one of them is currently being answered on a forum by somebody who bought badly from somebody else.

You also have an audience nobody else in housing has: buyers under contract watching a house go up for eight months. Progress content keeps them calm, keeps them off the phone to your sales office, and gets shown to everyone they know. The ideas below cover both jobs.

What actually performs for home builders

  • Weekly progress on a named lot gives buyers under contract a reason to check your account daily, and it cuts the number of anxious calls your sales team fields.
  • Showing what happens before the drywall is the strongest answer to the thin walls objection, because framing, insulation and air sealing are invisible in a finished photo.
  • Punch list content builds more trust than hiding it. Publishing what counts, what does not, and how fast you close a list tells buyers you expect scrutiny.
  • Utility bill comparisons convert. A sealed, insulated new house against the 1940s bungalow a buyer is leaving is a monthly number they can feel.
  • The crews are your best content. Framers, roofers and trim carpenters explaining one detail each humanize a company that otherwise looks like a brochure.

30 Instagram post ideas for home builders

Every idea below includes the first slide, the full slide sequence, and a caption starter. Swipe each preview to read the slides.

1.Foundation week

Behind the scenes

First slide

Nothing looks like a house yet. Everything matters now.

  1. 1/6

    Nothing looks like a house yet. Everything matters now.

    Swipe →
  2. 2/6

    Topsoil stripped, then the footings dug and staked out.

  3. 3/6

    Footings poured, then foundation walls and waterproofing.

  4. 4/6

    Drain tile, gravel, then backfill against walls that have cured.

  5. 5/6

    Underground plumbing set and tested before the slab goes down.

  6. 6/6

    Every mistake here sits under the whole house forever.

Caption starter

The least photogenic two weeks on any lot and the ones that decide everything above them. If you are under contract on this phase, this is what your money is doing this week.

Why it works: It turns an unglamorous stage into reassurance for buyers under contract, who are the people most likely to be watching daily.

Make this carousel

2.The build in order

Educational

First slide

A house in twelve stages. Where is yours?

  1. 1/6

    A house in twelve stages. Where is yours?

    Swipe →
  2. 2/6

    Footings, foundation, waterproofing, backfill, underground plumbing.

  3. 3/6

    Framing to the ridge, then sheathing and roof deck.

  4. 4/6

    Roofing, windows and exterior doors in. That is dried in.

  5. 5/6

    Rough-in: electrical, plumbing, heating, then insulation and drywall.

  6. 6/6

    Trim, cabinets, paint, flooring, walkthrough, closing.

Caption starter

Save this and check it against your house each week. Dried in is the stage where the pace suddenly looks like it stopped, and that is when the most work happens inside.

Why it works: It gives buyers under contract a map they can measure progress against, which converts anxiety into anticipation.

Make this carousel

3.What dried in actually means

Educational

First slide

Dried in is a milestone, not a description.

  1. 1/6

    Dried in is a milestone, not a description.

    Swipe →
  2. 2/6

    Roof covered, windows and exterior doors installed.

  3. 3/6

    It means the inside crews can finally start work.

  4. 4/6

    Rough electrical and plumbing begin the following week.

  5. 5/6

    From outside, nothing visible changes for about a month.

  6. 6/6

    That month is when half the house gets built.

Caption starter

The most common question our superintendents get is why nothing is happening. Everything is happening, it is just behind the sheathing now.

Why it works: It pre-empts the exact week buyers start worrying, which protects your sales team's time and your reputation.

Make this carousel

4.Thin walls

Myth-busting

First slide

New builds have thin walls. Let us open one up.

  1. 1/6

    New builds have thin walls. Let us open one up.

    Swipe →
  2. 2/6

    Exterior wall: two-by-six studs, dense insulation, house wrap, sheathing.

  3. 3/6

    Shared walls get a double stud and sound board the full height.

  4. 4/6

    Every seam and penetration gets sealed before insulation goes in.

  5. 5/6

    Old solid walls are thicker and hold far less heat.

  6. 6/6

    Thickness is not performance. The build-up is performance.

Caption starter

The objection we hear at every tour. Come out and look at an open wall before it gets covered, and you will never repeat it.

Why it works: It answers the single most common objection to new construction with physical evidence rather than a claim.

Make this carousel

5.When your selections close

FAQ

First slide

Yes, you can change it. Until this date.

  1. 1/6

    Yes, you can change it. Until this date.

    Swipe →
  2. 2/6

    Kitchen layout and cabinets: until rough-in starts.

  3. 3/6

    Outlets, switches and lighting: until rough-in starts.

  4. 4/6

    Tile, flooring and countertops: usually until drywall.

  5. 5/6

    Structural changes: only before framing. Often not at all.

  6. 6/6

    Ask your sales agent for your lot's cut-off dates.

Caption starter

Every house has a set of deadlines for choices, and they arrive earlier than most buyers expect. Ask for yours in writing the week you sign.

Why it works: It converts a vague worry into an actionable request, and it drives buyers to contact your sales office with a specific question.

Make this carousel

6.The final walkthrough

Social proof

First slide

Two hours of demonstration before anyone gets keys.

  1. 1/6

    Two hours of demonstration before anyone gets keys.

    Swipe →
  2. 2/6

    Every shutoff valve and breaker shown, labeled and photographed.

  3. 3/6

    Furnace, thermostat and water heater set up and explained.

  4. 4/6

    Filter sizes, where they live, and when to change them.

  5. 5/6

    The full folder: manuals, warranties and appliance registrations.

  6. 6/6

    Then the keys. Then the photo everyone actually wants.

Caption starter

The walkthrough is the most useful two hours of the whole purchase and the part nobody expects. Bring a notebook, and bring whoever will actually change the filters.

Why it works: It reframes the handoff as a professional process rather than a key exchange, which sets expectations for the aftercare you provide.

Make this carousel

7.What counts as a punch list item

Educational

First slide

What counts as a punch list item, and what does not.

  1. 1/6

    What counts as a punch list item, and what does not.

    Swipe →
  2. 2/6

    Yes: a paint run, a sticking door, a scratched countertop.

  3. 3/6

    Yes: missing grout, an outlet plate that is not square.

  4. 4/6

    No: a hairline drywall crack at three months.

  5. 5/6

    No: something damaged after you moved in.

  6. 6/6

    Write everything down anyway. We will tell you which is which.

Caption starter

New owners are often nervous about raising things, and we would far rather you raised twenty than sat on two. List everything in the first two weeks and send it in one go.

Why it works: Defining the standard yourself sets a fair expectation and encourages the early reporting that keeps a punch list manageable.

Make this carousel

8.First year cracks

Educational

First slide

That crack in the drywall is meant to happen.

  1. 1/6

    That crack in the drywall is meant to happen.

    Swipe →
  2. 2/6

    A new house holds a lot of water in its materials.

  3. 3/6

    Lumber, drywall compound and concrete all dry out year one.

  4. 4/6

    Hairline cracks show at seams and above door corners.

  5. 5/6

    Run the heat steady and keep the humidity in range.

  6. 6/6

    Touch up after twelve months, not before.

Caption starter

The most alarming and most normal thing about a first winter in a new house. Keep the temperature steady, watch the humidity, and leave the touch-up paint until year two.

Why it works: It defuses a complaint that would otherwise arrive as an angry review, and it demonstrates that you expected the question.

Make this carousel

9.Lot 14, from dirt to front door

Before & after

First slide

Same tripod, same corner, thirty-one weeks apart.

  1. 1/6

    Same tripod, same corner, thirty-one weeks apart.

    Swipe →
  2. 2/6

    Week 1: a stripped lot and a row of stakes.

  3. 3/6

    Week 6: footings poured, foundation walls up, backfilled.

  4. 4/6

    Week 14: framed to the ridge, roof decked, scaffolding up.

  5. 5/6

    Week 22: roofed, windows in, siding started.

  6. 6/6

    Week 31: sodded, driveway poured, keys handed over.

Caption starter

One photograph a week from the same spot for thirty-one weeks. If you are signing on the next phase, this is roughly your timeline.

Why it works: A fixed-camera time sequence is highly shareable and gives prospective buyers a realistic schedule without a single promise.

Make this carousel

10.The day the insulation goes in

Behind the scenes

First slide

The house gets quiet the day insulation goes in.

  1. 1/6

    The house gets quiet the day insulation goes in.

    Swipe →
  2. 2/6

    Every stud bay, every rim joist, every top plate.

  3. 3/6

    Spray foam at the band joist, dense batts in the walls.

  4. 4/6

    Attic blown to depth, measured against a ruler on a card.

  5. 5/6

    Gaps around outlets and pipes sealed before anything closes.

  6. 6/6

    This is the day your utility bill gets decided.

Caption starter

Nobody tours a house because of the insulation and everybody lives with it for thirty years. Ask any builder what depth goes in the attic and whether they seal before they insulate.

Why it works: It gives buyers a specific, comparable question to take to a competitor, which favors the builder who does the detail properly.

Make this carousel

11.Lots released

Offers & promos

First slide

Six lots released. Here is what is left.

  1. 1/6

    Six lots released. Here is what is left.

    Swipe →
  2. 2/6

    Two three-bedroom plans, both with south-facing back yards.

  3. 3/6

    Three four-bedroom plans, two of them with a study.

  4. 4/6

    One corner lot, level all the way, widest on the block.

  5. 5/6

    Signing holds the lot and locks the price.

  6. 6/6

    Send a lot number and I will send the packet today.

Caption starter

Six lots on the new phase, released this morning. Reply with a number and I will send the floor plans, the site map and the standard spec.

Why it works: Naming what is left creates scarcity honestly, and asking for a lot number gives you a warm, qualified conversation to open.

Make this carousel

12.Winter on site

Seasonal

First slide

What stops in winter, and what does not.

  1. 1/6

    What stops in winter, and what does not.

    Swipe →
  2. 2/6

    Below about forty degrees, concrete and mortar need help.

  3. 3/6

    Pours get blankets, heaters, or a later date entirely.

  4. 4/6

    Drywall compound and paint need heat and time to dry.

  5. 5/6

    Houses already dried in keep going all winter without interruption.

  6. 6/6

    This is why getting a roof on before December matters.

Caption starter

Every winter we get asked why one house is moving and the next one is not. It is almost always whether it got roofed before the first hard freeze.

Why it works: It explains uneven progress before buyers invent a worse explanation, protecting confidence through the slowest months.

Make this carousel

13.The fourteen crews

Educational

First slide

Fourteen crews build your house. Here they are.

  1. 1/6

    Fourteen crews build your house. Here they are.

    Swipe →
  2. 2/6

    Site work, concrete, framing, roofing, siding, windows.

  3. 3/6

    Plumbers, electricians, heating and cooling, insulators, drywallers.

  4. 4/6

    Then trim carpenters, tile setters, painters and the flooring crew.

  5. 5/6

    Same crews, same neighborhoods, for eleven years now.

  6. 6/6

    Ask any builder how long their framers have been with them.

Caption starter

A builder is really a schedule and a phone book. The quality of a house is the quality of the fourteen crews and how well they hand off to each other.

Why it works: It answers the quiet worry that a builder is faceless by naming the specific people who do the work.

Make this carousel

14.How long does a house take?

FAQ

First slide

How long does it take to build one house?

  1. 1/6

    How long does it take to build one house?

    Swipe →
  2. 2/6

    Site work and foundation: four to six weeks.

  3. 3/6

    Framing to dried in: eight to twelve weeks.

  4. 4/6

    Rough-in, insulation and drywall: six to eight weeks.

  5. 5/6

    Trim, cabinets, paint and flooring: eight to ten weeks.

  6. 6/6

    Roughly thirty to forty weeks, weather and supply allowing.

Caption starter

The honest range. Weather, ground conditions and material lead times move it more than anything else. Ask for the current schedule on the house you are considering.

Why it works: Giving a range with the variables named is more credible than a single number, and it inoculates against later slippage.

Make this carousel

15.Buying before it is built

Myth-busting

First slide

Buying before it is built is not a leap of faith.

  1. 1/5

    Buying before it is built is not a leap of faith.

    Swipe →
  2. 2/5

    Your price is locked at signing, whatever the market does.

  3. 3/5

    You choose cabinets, tile and flooring instead of inheriting them.

  4. 4/5

    You can walk the house at agreed times, with a hard hat.

  5. 5/5

    Ask to tour a finished house of the same plan first.

Caption starter

The best thing you can do before signing on an unbuilt house is walk a finished one of the same plan. Ask us to arrange it. We would rather you saw it.

Why it works: It converts hesitant buyers by replacing reassurance with a specific action they can demand from any builder.

Make this carousel

16.Stick built or panelized

Educational

First slide

Stick built or panelized? Honestly.

  1. 1/6

    Stick built or panelized? Honestly.

    Swipe →
  2. 2/6

    Panelized: walls built in a shop, much faster to dried in.

  3. 3/6

    Stick built: framed on site, easier to change midstream.

  4. 4/6

    Both end up behind the same siding. You cannot tell.

  5. 5/6

    Both use the same lumber and the same crews after framing.

  6. 6/6

    It changes the schedule far more than it changes the house.

Caption starter

This comes up at nearly every tour and the honest answer is that it matters far less than people think. Ask which one your house is and why we chose it.

Why it works: Giving a balanced answer to a loaded question demonstrates confidence and defuses a common source of buyer suspicion.

Make this carousel

17.The framing walk

Behind the scenes

First slide

We walk every house the day framing finishes.

  1. 1/6

    We walk every house the day framing finishes.

    Swipe →
  2. 2/6

    Every window opening measured against the plan.

  3. 3/6

    Blocking checked for the towel bars nobody thinks about.

  4. 4/6

    Square at the corners, level at every floor.

  5. 5/6

    Anything wrong gets fixed before a single wire goes in.

  6. 6/6

    It takes three hours and it saves three weeks.

Caption starter

The cheapest hour in homebuilding is the one spent standing in a framed house with a plan and a tape. Everything found here is free. Everything found later is not.

Why it works: It shows a quality process buyers cannot see in a finished house and gives them a question to ask other builders.

Make this carousel

18.Which kitchen layout

Engagement

First slide

Same room, two kitchen layouts. Which one?

  1. 1/6

    Same room, two kitchen layouts. Which one?

    Swipe →
  2. 2/6

    A: island in the middle, dining table at the yard end.

  3. 3/6

    B: full-length run, breakfast bar, more open floor.

  4. 4/6

    Identical footprint. Identical cost. Same plan.

  5. 5/6

    A gets you a social hub. B gets you circulation.

  6. 6/6

    Tell me A or B. Most buyers pick one instantly.

Caption starter

Both of these are available on this plan. Tell us which one you would take and why. We use these answers when we set the standard layout on the next phase.

Why it works: Asking buyers to choose between real options generates comments and gives you genuine market feedback for the next release.

Make this carousel

19.A year in

Social proof

First slide

We went back a year after they moved in.

  1. 1/6

    We went back a year after they moved in.

    Swipe →
  2. 2/6

    Two adults, two kids, one very large dog.

  3. 3/6

    Six punch list items in month one. All cleared in three weeks.

  4. 4/6

    Two drywall cracks in year one, filled before they painted.

  5. 5/6

    Utility bills roughly half the old house, same square footage.

  6. 6/6

    They have sent two families to us since.

Caption starter

A year is the only honest point to review a house. Nothing here is unusual, including the cracks. Ask any builder to introduce you to a buyer from twelve months ago.

Why it works: A twelve-month revisit that includes the problems reads as a genuine review rather than a marketing testimonial.

Make this carousel

20.What it costs to run

Educational

First slide

The old bungalow was cheaper. Until the bills.

  1. 1/6

    The old bungalow was cheaper. Until the bills.

    Swipe →
  2. 2/6

    Uninsulated walls, single pane windows, a thirty-year-old furnace.

  3. 3/6

    Our houses go out sealed, insulated and balanced room by room.

  4. 4/6

    Two-stage furnace, sealed ducts, fresh air brought in deliberately.

  5. 5/6

    The gap shows up every month, not only in January.

  6. 6/6

    Ask both sellers for twelve months of actual utility bills.

Caption starter

The purchase price is one number and the running cost is another. Get twelve months of real bills for both houses and compare them over ten years.

Why it works: It reframes a price comparison in your favor with a document the buyer can verify independently.

Make this carousel

21.Second generation

Personal brand

First slide

My dad laid the brick on his first four houses himself.

  1. 1/6

    My dad laid the brick on his first four houses himself.

    Swipe →
  2. 2/6

    Four houses on a corner lot, finished in 1987.

  3. 3/6

    He still drives past them. Two are on their third owners.

  4. 4/6

    I walk every house before the drywall goes up. Every one.

  5. 5/6

    Because in thirty years somebody will still be living in it.

  6. 6/6

    That is the whole job, really.

Caption starter

The reason we still do the framing walk the slow way. Houses outlast builders, and the ones we finish this year will be somebody's home in 2060.

Why it works: A specific family detail gives a company a face, which is the one thing volume builders cannot replicate.

Make this carousel

22.The selections appointment

Educational

First slide

Four hours, two hundred decisions, one appointment.

  1. 1/6

    Four hours, two hundred decisions, one appointment.

    Swipe →
  2. 2/6

    Cabinets and countertops first. Everything else follows them.

  3. 3/6

    Flooring, tile and paint, then lighting and hardware.

  4. 4/6

    Bring photos of real rooms you like, not a mood board.

  5. 5/6

    Eat beforehand. Decision fatigue is real by hour three.

  6. 6/6

    Nothing is final until you sign the sheet.

Caption starter

The longest four hours of the whole purchase and the ones people enjoy most. Bring photos, bring a snack, and bring whoever else gets a vote.

Why it works: Demystifying the most intimidating appointment in the process removes a reason to delay signing.

Make this carousel

23.Model home open

Offers & promos

First slide

The model home opens Saturday. Come stress-test it.

  1. 1/6

    The model home opens Saturday. Come stress-test it.

    Swipe →
  2. 2/6

    Open 10 to 4, no appointment for the first weekend.

  3. 3/6

    Bring a tape measure. Bring your sofa dimensions.

  4. 4/6

    Open the linen closet. Look up the attic hatch.

  5. 5/6

    The superintendent is there from 11 for build questions.

  6. 6/6

    Site maps and the full spec sheet available on the day.

Caption starter

Model homes are usually staged to stop you looking closely. Come and look closely. The superintendent will be there for the questions the sales team cannot answer.

Why it works: Inviting scrutiny is a confident, unusual move that separates you from the staged-tour expectation buyers arrive with.

Make this carousel

24.The spring push

Seasonal

First slide

Sign in March, move in before the school year.

  1. 1/5

    Sign in March, move in before the school year.

    Swipe →
  2. 2/5

    Houses at dried in now close in roughly fourteen weeks.

  3. 3/5

    Add four to six weeks for your loan and the appraisal.

  4. 4/5

    Selections close before rough-in, which is sooner than you think.

  5. 5/5

    Ask which houses are at the right stage for your date.

Caption starter

If you need to be in for the start of the school year, the house has to already be at the right stage. Tell us your date and we will tell you which ones can meet it.

Why it works: Matching build stage to a family deadline is a genuine reason to act now, and it moves the houses closest to completion.

Make this carousel

25.Why the windows were late

Educational

First slide

The windows took eleven weeks. Here is why.

  1. 1/6

    The windows took eleven weeks. Here is why.

    Swipe →
  2. 2/6

    Every unit is made to the exact opening on that house.

  3. 3/6

    Glass, frames and exterior finishes are all made to order.

  4. 4/6

    One measurement error and the whole order gets remade.

  5. 5/6

    So we measure after the openings exist, not before.

  6. 6/6

    Which is why dried in is never the week after framing.

Caption starter

Lead times are the least understood part of a build schedule. Almost nothing on a house is off the shelf, and that is usually a good thing.

Why it works: Explaining a delay before anyone complains about it converts a potential grievance into evidence of care.

Make this carousel

26.What is in the price

FAQ

First slide

What is included, and what is genuinely extra.

  1. 1/6

    What is included, and what is genuinely extra.

    Swipe →
  2. 2/6

    Included: cabinets, appliances, flooring throughout, sodded yard.

  3. 3/6

    Included: driveway, exterior hose bibs, shelving in every closet.

  4. 4/6

    Extra: upgraded countertops, added outlets, patio and landscaping.

  5. 5/6

    Extra: any structural change, and anything after rough-in.

  6. 6/6

    Ask for the standard spec sheet before you compare prices.

Caption starter

Two builders can advertise the same price with wildly different specs. Get both spec sheets and put them side by side before you decide anything.

Why it works: Encouraging a like-for-like comparison favors the builder with the fuller spec and positions you as the transparent one.

Make this carousel

27.The wall before the drywall

Behind the scenes

First slide

This is your wall the week before it disappears.

  1. 1/6

    This is your wall the week before it disappears.

    Swipe →
  2. 2/6

    Every wire run, every pipe, every piece of blocking.

  3. 3/6

    Outlets set out to the plan you signed off on.

  4. 4/6

    Insulation in, seams sealed, nothing hidden yet.

  5. 5/6

    We photograph every wall before it gets covered.

  6. 6/6

    The photos go in your closing folder.

Caption starter

Every house gets photographed before drywall, and the images come to you at closing. In ten years when you want to hang a shelf, you will know exactly where not to drill.

Why it works: A tangible, useful deliverable nobody else offers gives buyers a concrete reason to prefer you.

Make this carousel

28.Customizing a new build

Myth-busting

First slide

You cannot customize a new build. Not true.

  1. 1/6

    You cannot customize a new build. Not true.

    Swipe →
  2. 2/6

    Cabinet layout, door style, countertop and hardware.

  3. 3/6

    Added outlets, data drops, and where every light goes.

  4. 4/6

    Tile, flooring, interior doors and the trim profile.

  5. 5/6

    Some plans allow a third bay, a study or a bigger porch.

  6. 6/6

    The limit is timing, not policy. Choose before rough-in.

Caption starter

The real limit is the calendar, not the rulebook. Sign early enough and you make more decisions than you would in a whole remodel.

Why it works: It converts the buyers who believe new construction means identical boxes, while driving early signings by tying choice to timing.

Make this carousel

29.Punch list, two weeks later

Social proof

First slide

Twenty-three punch list items. Here is the closing list.

  1. 1/6

    Twenty-three punch list items. Here is the closing list.

    Swipe →
  2. 2/6

    Fourteen were paint and touch-up. Done in four days.

  3. 3/6

    Six were adjustments to doors, drawers and hardware.

  4. 4/6

    Two were tile and grout, both redone completely.

  5. 5/6

    One was a window seal, replaced by the manufacturer.

  6. 6/6

    All twenty-three closed within fifteen working days.

Caption starter

We publish our closing times because we would rather be judged on them than avoid the subject. Ask any builder how long their average punch list takes to clear.

Why it works: Publishing a number your competitors will not is a hard-to-copy trust signal that also sets a question buyers will repeat elsewhere.

Make this carousel

30.Can I come see it being built?

FAQ

First slide

Yes, you can visit. Here is how it works.

  1. 1/6

    Yes, you can visit. Here is how it works.

    Swipe →
  2. 2/6

    Book it with your superintendent. Never just show up.

  3. 3/6

    Closed-toe boots and a hard hat. We keep spares.

  4. 4/6

    Best days are Tuesday to Thursday, after ten in the morning.

  5. 5/6

    You will get far more from a guided walk than a fence photo.

  6. 6/6

    Message us and we will put a time in the calendar.

Caption starter

People assume the answer is no and it almost never is. Book a walk with the superintendent and you will learn more in twenty minutes than in a month of photos.

Why it works: Turning an assumed refusal into an invitation converts curiosity into a booked appointment with the person who can answer everything.

Make this carousel

How often to post

Three posts a week works well: one progress update on a named lot, one educational or myth-busting carousel, and one lot release, model home or buyer story. Shoot the site photos on the same walk every Friday.

Hashtags for home builders

Mix these with location tags for your own area. Put them in the first comment so the caption stays readable.

  • #homebuilder
  • #newconstruction
  • #customhomebuilder
  • #newhomes
  • #homebuilding
  • #buildingahome
  • #modelhome
  • #constructionprogress
  • #framing
  • #houseplans
  • #newhomeconstruction
  • #firsttimehomebuyer
  • #jobsite
  • #dreamhomebuild

Frequently asked questions

Turn any idea above into a finished carousel

Paste the hook, let Feedda draft the slides and visuals, edit anything, and export for Instagram in the right dimensions.