Professional services

30 Instagram Post Ideas for Manufacturing Companies

Design engineers and procurement managers holding an RFQ, plus the setters, welders and apprentices you need on the factory floor next year.

First-slide hooks writtenSlide-by-slide outlinesCaption starters

Why most manufacturing companies struggle on Instagram

Manufacturing gets written off as unphotogenic by people who have never stood next to a five-axis mill. A solid block becoming a finished part, a fixture holding six components at once, a CMM probe touching down forty times inside one bore: this is the most watchable raw material any business type has. The tolerances are what turn it from a satisfying video into an argument for hiring you.

The second problem an account solves is recruitment. Setters, welders and toolmakers are the constraint on almost every factory floor, and high school graduates still picture a dark oily shed from 1978. Photographs correct that faster than an open house ever will, and so does simply stating the shift patterns, the length of the apprenticeship and who pays the college tuition, because almost nobody in the trade does.

The ideas below are split between the buyer and the applicant. Explainers for the engineer or procurement manager holding a drawing, covering tolerances, lead time, surface finish and the arithmetic of setup cost, and posts that make a good machinist wonder what your factory looks like inside.

What actually performs for manufacturing companies

  • Put the number in slide one. Three ten-thousandths, fourteen hours, four hundred parts overnight — the figure is what turns process footage into an argument rather than a nice video.
  • Explain a price instead of defending it. The setup-versus-unit arithmetic converts more buyers than any capability list, because it teaches them to order in a way that suits your machines.
  • Design-for-manufacture advice given away free at drawing stage is the closest thing this trade has to a funnel. Mark up a model in public and the inquiries arrive already qualified.
  • Recruitment posts need the same specificity as the technical ones: name the shift pattern, the length of the apprenticeship, the class schedule and who pays the tuition.
  • Quality vocabulary works as a filter. First article inspection, PPM, material certification, weld procedure, certificate scope: those words hold the attention of the people who place orders and lose everyone else.

30 Instagram post ideas for manufacturing companies

Every idea below includes the first slide, the full slide sequence, and a caption starter. Swipe each preview to read the slides.

1.What three ten-thousandths looks like

Behind the scenes

First slide

This tolerance is a tenth of a human hair

  1. 1/6

    This tolerance is a tenth of a human hair

    Swipe →
  2. 2/6

    The drawing calls for plus or minus three ten-thousandths.

  3. 3/6

    A human hair is about three thousandths of an inch.

  4. 4/6

    Measured on a CMM in a room held at 68 degrees.

  5. 5/6

    Checked warm off the machine, this part would fail.

  6. 6/6

    That's why the inspection room has its own air conditioning.

Caption starter

Three ten-thousandths means nothing until you put a hair next to it. It's also why parts sit for an hour before anyone measures them. Send me a drawing and I'll tell you what's realistically achievable.

Why it works: Making an abstract tolerance physical is what turns a technical capability into something a non-engineer will stop scrolling for.

Make this carousel

2.The first part costs $500

Educational

First slide

The first part costs $500. The next 500 cost $8.

  1. 1/6

    The first part costs $500. The next 500 cost $8.

    Swipe →
  2. 2/6

    Programming, fixturing and proving out happen exactly once.

  3. 3/6

    Setting the machine takes four hours. Cutting takes ninety seconds.

  4. 4/6

    That setup gets spread across whatever quantity you order.

  5. 5/6

    Order ten and you are paying for the setup ten times.

  6. 6/6

    Ask for price breaks at 50, 250 and 1,000. Always.

Caption starter

This is why a quote for ten looks insulting next to a quote for a thousand. Ask every supplier for quantity breaks and watch the setup cost separate itself out of the price.

Why it works: It explains a price structure buyers routinely misread as greed, and teaches them to order in the quantities your machines are efficient at.

Make this carousel

3.Everything we need to quote

Educational

First slide

Everything we need to quote, on one slide

  1. 1/6

    Everything we need to quote, on one slide

    Swipe →
  2. 2/6

    A 2D drawing with tolerances, or a model with a note.

  3. 3/6

    Material and specification. "Aluminum" is not a specification.

  4. 4/6

    Quantity now, and the quantities you might order later.

  5. 5/6

    Surface finish, treatment, and any inspection requirement.

  6. 6/6

    Send those five and the quote comes back inside 48 hours.

Caption starter

Half the inquiries we get need three emails before anyone can price them. Send these five things together and you'll have a firm number in two days.

Why it works: Publishing your quoting requirements shortens your own sales cycle and signals a disciplined process to a buyer who is comparing suppliers.

Make this carousel

4.Nobody here is covered in oil

Myth-busting

First slide

Nobody in this building is covered in oil

  1. 1/6

    Nobody in this building is covered in oil

    Swipe →
  2. 2/6

    The machines are enclosed. The coolant stays inside them.

  3. 3/6

    The inspection room is cleaner than most offices.

  4. 4/6

    It's warm, it's bright, and the floor gets painted.

  5. 5/6

    Everyone here started somewhere. Most of them at sixteen.

  6. 6/6

    Come and look around before you decide it isn't for you.

Caption starter

The picture most people carry of a factory is about forty years out of date. We run open houses most months. Message us and we'll book you in.

Why it works: Perception of the workplace is the single biggest barrier to recruiting young people, and only photographs can correct it.

Make this carousel

5.One block, one setup, fourteen hours

Behind the scenes

First slide

One block of aluminum. Fourteen hours. One setup.

  1. 1/6

    One block of aluminum. Fourteen hours. One setup.

    Swipe →
  2. 2/6

    Five axes means cutting from every angle without re-clamping.

  3. 3/6

    Every time a part is re-clamped, accuracy is lost.

  4. 4/6

    One setup means one datum and one source of error.

  5. 5/6

    The programming took longer than the machining did.

  6. 6/6

    That's the trade: think for a week, cut for a day.

Caption starter

The satisfying part is the last hour. The valuable part was the week of programming that made a single setup possible. Send me a model if you have a part currently taking four operations.

Why it works: It sells the invisible engineering by attaching it to footage people will happily watch to the end anyway.

Make this carousel

6.Four apprenticeships, September start

Offers & promos

First slide

Four apprenticeships, starting September. Here's the deal.

  1. 1/6

    Four apprenticeships, starting September. Here's the deal.

    Swipe →
  2. 2/6

    Four years, paid, with one day a week at the college.

  3. 3/6

    Paid from day one. Fees covered. No debt at the end.

  4. 4/6

    You'll be set on a machine in year two, not sweeping floors.

  5. 5/6

    Every supervisor here came through this same program.

  6. 6/6

    Message APPRENTICE and we'll send the application pack.

Caption starter

Four places for September, and they go to the people who ask rather than the people who wait. Message APPRENTICE and we'll send the pack out this week.

Why it works: Apprenticeship posts get shared by parents and school careers staff, which reaches an audience your own website never touches.

Make this carousel

7.Why we said no to your order for two

FAQ

First slide

Why we said no to your order for two parts

  1. 1/6

    Why we said no to your order for two parts

    Swipe →
  2. 2/6

    Two parts still need a full program and a proving run.

  3. 3/6

    The setup costs the same as it would for two thousand.

  4. 4/6

    You'd be quoted $750 each and be rightly annoyed.

  5. 5/6

    For one-offs, ask for a prototype quote. Different process entirely.

  6. 6/6

    Tell us the eventual volume and the answer usually changes.

Caption starter

Turning small orders away always sounds unhelpful, so here's the arithmetic behind it. If this is a prototype heading for production, say so and we'll quote it a different way.

Why it works: Explaining a refusal keeps the relationship alive for the production order that usually follows a prototype eighteen months later.

Make this carousel

8.Plan around the July shutdown

Seasonal

First slide

We shut for two weeks in July. Plan backwards.

  1. 1/6

    We shut for two weeks in July. Plan backwards.

    Swipe →
  2. 2/6

    So do most of our material suppliers and treatment houses.

  3. 3/6

    Anodizing and heat treatment queues double either side of it.

  4. 4/6

    A six-week lead time becomes ten across the shutdown.

  5. 5/6

    Orders placed in May ship before we close the doors.

  6. 6/6

    Send your August and September requirements now.

Caption starter

The same crunch every year and it is entirely predictable. If you need parts in August, the order wants placing in May. Send me your schedule and we'll book the slots.

Why it works: An industry-wide fixed shutdown gives you a legitimate deadline to sell against without inventing any urgency.

Make this carousel

9.Eleven years, thirty-eight rejects

Social proof

First slide

Eleven years, 240,000 parts, 38 rejects

  1. 1/6

    Eleven years, 240,000 parts, 38 rejects

    Swipe →
  2. 2/6

    Their quality team tracks that as a parts-per-million figure.

  3. 3/6

    Every reject investigated with an 8D report, not an apology.

  4. 4/6

    Three of the thirty-eight changed how we fixture that part.

  5. 5/6

    They audit us annually. We've never lost a day of supply.

  6. 6/6

    Ask any supplier for their PPM and their corrective actions.

Caption starter

Consistency is the only thing a production buyer genuinely wants. Ask any supplier for their PPM figure and what they actually did about the last reject.

Why it works: Quality data expressed in the buyer's own language proves you operate inside their systems, which is what a supplier audit is looking for.

Make this carousel

10.Why your parts still don't fit

Educational

First slide

Your drawing says ±.005 and the parts still don't fit

  1. 1/6

    Your drawing says ±.005 and the parts still don't fit

    Swipe →
  2. 2/6

    Plus or minus controls size. It does not control position.

  3. 3/6

    Four holes each in tolerance can still miss the mating part.

  4. 4/6

    A position tolerance from a stated datum controls the relationship.

  5. 5/6

    Without datums we pick one, and we may pick differently than you.

  6. 6/6

    Add the datums. It costs nothing and prevents the argument.

Caption starter

The most common drawing problem we see, and it usually surfaces at assembly rather than at inspection. Send me a drawing and I'll flag anything undefined before we quote it.

Why it works: Correcting a drawing error before quotation saves the customer money and shows engineering judgment rather than order-taking.

Make this carousel

11.Forty pages for one part

Behind the scenes

First slide

The first part off the machine gets a 40-page report

  1. 1/6

    The first part off the machine gets a 40-page report

    Swipe →
  2. 2/6

    Every dimension on the drawing, ballooned and numbered.

  3. 3/6

    Each one measured, recorded and signed against its balloon.

  4. 4/6

    Material certificate and treatment certificate attached to it.

  5. 5/6

    Nothing else runs until the customer signs that report off.

  6. 6/6

    Slow on purpose. It's the cheapest place to find a mistake.

Caption starter

First article inspection is the least glamorous part of this job and the reason we don't scrap five hundred parts. Ask any supplier whether a FAIR comes as standard or as an extra.

Why it works: Documenting the checkpoint that prevents a disaster reassures a buyer more than any general claim about quality ever could.

Make this carousel

12.Five drawing changes that halve your price

Educational

First slide

Five drawing changes that would halve your price

  1. 1/6

    Five drawing changes that would halve your price

    Swipe →
  2. 2/6

    Loosen the tolerances that aren't functional. Most of them aren't.

  3. 3/6

    Match internal corner radii to a standard cutter size.

  4. 4/6

    Avoid deep pockets. Depth beyond four times diameter costs money.

  5. 5/6

    One surface finish across the part, not four different ones.

  6. 6/6

    Send the model before it's frozen and we'll mark it up free.

Caption starter

Nine times out of ten the expensive feature on a part is not one anybody meant to specify. Send us a model at design stage and we'll mark it up before it gets locked down.

Why it works: Free design-for-manufacture advice at drawing stage wins you the production order without ever quoting against a competitor.

Make this carousel

13.The overseas quote was 40% cheaper

Myth-busting

First slide

The quote from overseas was 40% cheaper. Here's the rest.

  1. 1/6

    The quote from overseas was 40% cheaper. Here's the rest.

    Swipe →
  2. 2/6

    Tooling paid up front, and it stays on their factory floor.

  3. 3/6

    Twelve-week lead time and a container as a minimum order.

  4. 4/6

    Working capital tied up in stock for an entire quarter.

  5. 5/6

    One drawing revision costs six weeks, not six hours.

  6. 6/6

    Compare landed cost and lead time, not the unit price.

Caption starter

Not an argument against offshore, which suits high volume perfectly well. It's an argument for comparing the whole cost. Send me the part and we'll price it on landed cost.

Why it works: Reframing the comparison from unit price to landed cost is the only way a domestic manufacturer wins a price conversation.

Make this carousel

14.Six weeks, not six days

FAQ

First slide

Why our lead time is six weeks and not six days

  1. 1/6

    Why our lead time is six weeks and not six days

    Swipe →
  2. 2/6

    Week one: material. Bar and plate aren't always on a shelf.

  3. 3/6

    Weeks two and three: programming, fixtures, first-off approval.

  4. 4/6

    Week four: the run itself, which is often the shortest part.

  5. 5/6

    Weeks five and six: treatment, plating, final inspection.

  6. 6/6

    Repeat orders drop to two weeks. The first one pays for that.

Caption starter

Lead time is mostly waiting on other people, which is why the second order is always faster. If you have a date to hit, tell us the date and we'll work backwards from it.

Why it works: Breaking a lead time into visible stages stops it reading as padding and makes the repeat-order advantage obvious.

Make this carousel

15.Every bar has a number on it

Educational

First slide

Every bar of material here has a number on it

  1. 1/6

    Every bar of material here has a number on it

    Swipe →
  2. 2/6

    Cast number, heat number, and a mill certificate to match.

  3. 3/6

    Offcuts get marked before they go back on the rack.

  4. 4/6

    The job number links the finished part to the bar it came from.

  5. 5/6

    If a batch is questioned in six years, we can find it.

  6. 6/6

    No certificate, no traceability, no aerospace work.

Caption starter

Traceability sounds like pointless paperwork right up until somebody asks where a part from 2019 came from. Ask your supplier whether they could answer that in an afternoon.

Why it works: Traceability is a hard requirement in aerospace and medical work, so proving it qualifies you for orders an unaccredited shop never gets to quote.

Make this carousel

16.Guess what this part does

Engagement

First slide

Guess what this part does. Nobody ever gets it.

  1. 1/6

    Guess what this part does. Nobody ever gets it.

    Swipe →
  2. 2/6

    Clues: titanium, forty grams, and one of only six made.

  3. 3/6

    The bore is held to half a thousandth.

  4. 4/6

    It has a mating part we have never been allowed to see.

  5. 5/6

    It ends up somewhere you have definitely been.

  6. 6/6

    Guesses in the comments. We'll reveal it on Friday.

Caption starter

One of our favorite jobs and nobody ever guesses right. Clues are in the carousel, the answer goes up on Friday. Put your guess below.

Why it works: Guess-the-part turns a static photograph of metal into a reason for engineers to comment and tag the colleague who would know.

Make this carousel

17.Ra 32 or Ra 125

Educational

First slide

Ra 32 or Ra 125? It changes the price.

  1. 1/6

    Ra 32 or Ra 125? It changes the price.

    Swipe →
  2. 2/6

    Ra is average roughness in microinches. Lower means smoother.

  3. 3/6

    As-machined sits around Ra 125. That one is free.

  4. 4/6

    Ra 63 needs a finishing pass. Ra 32 needs several.

  5. 5/6

    Ra 16 usually means grinding or lapping. Different machine.

  6. 6/6

    Specify a fine finish only where it seals, slides or seats.

Caption starter

Surface finish gets copied off an old drawing far more often than it gets chosen, and it can double a price on its own. Check yours before the next inquiry goes out.

Why it works: Teaching a buyer where their money goes tends to consolidate their work with the supplier who did the teaching.

Make this carousel

18.They left on price, came back on scrap

Social proof

First slide

They left us on price and came back on scrap

  1. 1/6

    They left us on price and came back on scrap

    Swipe →
  2. 2/6

    We were 18% higher. Four thousand parts a year went elsewhere.

  3. 3/6

    Nine months on, their line was reworking one in twelve.

  4. 4/6

    Rework cost more than the saving inside a single quarter.

  5. 5/6

    We requalified the part and re-ran the inspection from scratch.

  6. 6/6

    Four years back with us now, at the same price.

Caption starter

Shared with their permission, and they aren't embarrassed about it. If you're comparing on unit price, work out what an hour of rework costs you first.

Why it works: A customer who left and returned is the most credible proof available, because the buyer ran the experiment themselves.

Make this carousel

19.December is when the budget disappears

Seasonal

First slide

December is when the capital budget disappears

  1. 1/6

    December is when the capital budget disappears

    Swipe →
  2. 2/6

    Unspent capex at year end rarely carries into the next one.

  3. 3/6

    Tooling, jigs and fixtures are capital, not consumables.

  4. 4/6

    So is a stock build against next year's schedule.

  5. 5/6

    Lead times mean a March delivery is an October decision.

  6. 6/6

    Send us your year-end list and we'll say what's achievable.

Caption starter

If you have budget that expires with your fiscal year, tooling and fixture work is the easiest thing to place quickly. Send me the list and I'll tell you what can still land in time.

Why it works: Selling against the customer's own budget calendar creates urgency that belongs to them rather than urgency you invented.

Make this carousel

20.Four operations became two

Before & after

First slide

Four operations became two. Same part, same drawing.

  1. 1/6

    Four operations became two. Same part, same drawing.

    Swipe →
  2. 2/6

    Before: mill, flip, mill, then drill on a second machine.

  3. 3/6

    Four handlings, four chances to introduce an error.

  4. 4/6

    We built a fixture holding six parts on one table.

  5. 5/6

    After: two operations, one machine, one operator.

  6. 6/6

    Cycle time down 44%. The price came down with it.

Caption starter

The customer didn't ask for this and didn't pay for the fixture design. It came out of a Friday afternoon and a whiteboard. If you've got a part sat on four operations, send it over.

Why it works: A quantified process improvement shows a buyer you keep finding savings after the contract is signed, which is what renews it.

Make this carousel

21.Nobody has been in since six

Behind the scenes

First slide

Nobody has been in this building since six

  1. 1/6

    Nobody has been in this building since six

    Swipe →
  2. 2/6

    The bar feeder holds twelve feet of material.

  3. 3/6

    Tool life is monitored. Worn tools swap themselves out.

  4. 4/6

    A probe checks the part every twentieth cycle.

  5. 5/6

    If anything drifts, the machine stops and texts the foreman.

  6. 6/6

    Four hundred parts by morning, with nobody watching.

Caption starter

Lights-out running is why we can quote volumes that look impossible on a two-shift day rate. Message me if you want to see the overnight report.

Why it works: Unattended machining is a capability most buyers do not know to ask about, and showing it justifies volume pricing that otherwise looks unlikely.

Make this carousel

22.The four hours before you press go

Myth-busting

First slide

"You just press go." Here's the four hours first.

  1. 1/6

    "You just press go." Here's the four hours first.

    Swipe →
  2. 2/6

    Fixture built, aligned and clocked in to half a thousandth.

  3. 3/6

    Tools set, measured, loaded into the offsets table.

  4. 4/6

    Program proved line by line at ten percent feed.

  5. 5/6

    First-off cut, measured, offsets corrected, cut again.

  6. 6/6

    Then you press go. That bit takes one second.

Caption starter

The setter is the job. The button is not. If anyone tells you CNC deskilled machining, show them a four-hour setup and ask them to do it.

Why it works: Defending the skill of the trade earns loyalty from the people already in it and curiosity from the people considering it.

Make this carousel

23.Ask for the certification, not the price

Educational

First slide

Ask for the welder's certification before you ask the price

  1. 1/6

    Ask for the welder's certification before you ask the price

    Swipe →
  2. 2/6

    A weld procedure specification defines exactly how it is done.

  3. 3/6

    The welder is tested and qualified against that procedure.

  4. 4/6

    Certification is material-specific, position-specific and expires.

  5. 5/6

    We won't run structural or pressure work without it.

  6. 6/6

    A tidy weld and a qualified weld are not the same thing.

Caption starter

A neat-looking weld tells you almost nothing on its own. Ask for the procedure and the welder's current certifications on every structural job, ours included.

Why it works: Handing the buyer a question to ask exposes competitors who cannot answer it, using their own procurement process.

Make this carousel

24.Time served in 1986

Personal brand

First slide

I served my time on a manual lathe in 1986

  1. 1/6

    I served my time on a manual lathe in 1986

    Swipe →
  2. 2/6

    Four years, one day a week at the college, a strict foreman.

  3. 3/6

    The machines changed completely. The thinking didn't.

  4. 4/6

    I still measure the first one myself. Habit, mostly.

  5. 5/6

    Every apprentice we take on is a debt being repaid.

  6. 6/6

    The trade only continues if somebody teaches the next one.

Caption starter

Thirty-eight years in this trade. The machines are unrecognizable and the job is exactly the same. Message us if you want to start yours in September.

Why it works: A founder's craft story gives a metal-bashing business a personality and doubles as the most persuasive apprenticeship ad you can run.

Make this carousel

25.Prototypes and production are different jobs

FAQ

First slide

Yes, we do one-offs. Here's how they differ.

  1. 1/6

    Yes, we do one-offs. Here's how they differ.

    Swipe →
  2. 2/6

    Prototype: fast, manual setups, tolerances loosened where possible.

  3. 3/6

    Production: fixtures, proving, documentation, repeatability.

  4. 4/6

    A prototype price does not scale into a production price.

  5. 5/6

    Tell us at the start which of the two you're asking for.

  6. 6/6

    Most of our production work began as somebody's prototype.

Caption starter

We quote prototypes and production differently because they are genuinely different jobs. Say which you need and we'll price the right one. Send the model over.

Why it works: Capturing prototypes is how you win the production run years later, and saying so makes a first inquiry feel low risk.

Make this carousel

26.Spindle time available

Offers & promos

First slide

Spindle time available in the next two weeks

  1. 1/6

    Spindle time available in the next two weeks

    Swipe →
  2. 2/6

    One 5-axis mill free from the 12th. Envelope 20 by 16 inches.

  3. 3/6

    Turning capacity on bar up to 2.5 inches diameter.

  4. 4/6

    Inspection and first article report included, as standard.

  5. 5/6

    Short notice priced at our normal rates, not panic rates.

  6. 6/6

    Send a model and a quantity and we'll answer today.

Caption starter

Genuine free capacity over the next two weeks, and we don't price short notice any differently. Send a model and a quantity and I'll come back the same day.

Why it works: Publishing real capacity gives a buyer with a stalled project a reason to try you without going through formal supplier onboarding.

Make this carousel

27.What the certificate actually means

Educational

First slide

What our ISO certificate actually means to you

  1. 1/6

    What our ISO certificate actually means to you

    Swipe →
  2. 2/6

    It doesn't say the parts are good. It says the process is controlled.

  3. 3/6

    Documented procedures, calibrated equipment, recorded corrections.

  4. 4/6

    An external auditor checks it annually. We can and do fail items.

  5. 5/6

    Check the scope on the certificate. It may not cover your work.

  6. 6/6

    Ask for the scope and the expiry date, not just the logo.

Caption starter

The logo on a website means very little. The scope statement on the certificate means everything. Ask any supplier for theirs, and that includes us.

Why it works: Teaching a buyer to interrogate accreditation makes you the trusted supplier and quietly disqualifies competitors with decorative certificates.

Make this carousel

28.He started at sixteen

Social proof

First slide

He started at sixteen. He now runs the cell.

  1. 1/6

    He started at sixteen. He now runs the cell.

    Swipe →
  2. 2/6

    2013: deburring, sweeping, and asking a lot of questions.

  3. 3/6

    2016: qualified, setting his own jobs on the mills.

  4. 4/6

    2019: programming, then training the next intake.

  5. 5/6

    Now: runs a four-machine cell and signs off first-offs.

  6. 6/6

    Eleven years. No debt, and a trade for life.

Caption starter

This is the case for apprenticeships in one carousel. Eleven years, no student debt, and a skill nobody can take away from him. Applications are open now.

Why it works: One traced career path convinces a school leaver and their parents far more effectively than any list of benefits.

Make this carousel

29.What a machinist actually earns

Educational

First slide

What a machinist actually earns, and the shifts

  1. 1/6

    What a machinist actually earns, and the shifts

    Swipe →
  2. 2/6

    First shift: the base rate, and by far the easiest life.

  3. 3/6

    Second shift: afternoons into the night, roughly a tenth more.

  4. 4/6

    Third shift: a bigger premium again, and a very different week.

  5. 5/6

    Overtime is usually available. It should never be mandatory.

  6. 6/6

    Ask about the shift pattern before you ask about the rate.

Caption starter

Nobody in this trade publishes this and everybody wants to know it. If you're a setter or an operator thinking about a move, message us and we'll talk numbers right away.

Why it works: Publishing the structure of pay rather than hiding it behind an application form is what makes skilled people message a factory they had never heard of.

Make this carousel

30.Model without a drawing

FAQ

First slide

Can you make it from the model, with no drawing?

  1. 1/6

    Can you make it from the model, with no drawing?

    Swipe →
  2. 2/6

    Yes, and it's often faster. On two conditions.

  3. 3/6

    One: state the general tolerance standard on the model.

  4. 4/6

    Two: mark the critical features. Every part has three or four.

  5. 5/6

    Without those we default to a standard you might disagree with.

  6. 6/6

    A model plus a one-page note beats a bad drawing every time.

Caption starter

Model-based definition is fine by us and usually quicker. Just tell us the general tolerance and which features are critical. Send it over and we'll confirm before quoting.

Why it works: It removes a procedural worry that stops younger design engineers approaching a traditional machine shop at all.

Make this carousel

How often to post

Two posts a week, and both can come off the factory floor. Ask the setters to film thirty seconds whenever something interesting is on the table, then spend an hour every two weeks turning the best clips into carousels with the numbers written in.

Hashtags for manufacturing companies

Mix these with location tags for your own area. Put them in the first comment so the caption stays readable.

  • #manufacturing
  • #cncmachining
  • #precisionengineering
  • #machineshop
  • #5axismachining
  • #madeinusa
  • #americanmanufacturing
  • #toolmaking
  • #engineeringapprenticeship
  • #metalworking
  • #cncmilling
  • #fabrication
  • #engineeringjobs
  • #iso9001
  • #subcontractmachining

Frequently asked questions

Turn any idea above into a finished carousel

Paste the hook, let Feedda draft the slides and visuals, edit anything, and export for Instagram in the right dimensions.